Adjustable 48/40MM Scaffolding
Scaffolding is a main part in Formwork project, A complete set of steel prop consists of an inner tube, an outer tube, a prop nut, a Jack plate and a Base plate. it can be adjusted to any length inside its range.
Description: Steel scaffolding struts
The scaffolding is the main component in the formwork project, a complete set of steel pillars by the inner tube, the outer tube, the pillar nut, the top plate and the bottom plate. It can be adjusted to any length within its range. Props have several names, including: scaffolding props, formwork props, industrial props, construction props, shore props, straddle props, straddle jacks, bow props, and shore backs. They are height adjustable with wide diameter threads, which are on the outside of the tube. The use of threads means that props can be tightened when they are already in place, which allows users to adjust the load on each prop.
Details of Adjustable Scaffolding Steel Prop
| ITEM NO. | Closed Length(mm) | Open Length(mm) | Reference Weight(kg) | Work Bearing Capacity |
| SLMP-D25 | 1450 | 2500 | 15.1 | 20kN |
| SLMP-D30 | 1800 | 3000 | 17.1 | 20kN |
| SLMP-D35 | 2000 | 3500 | 18.9 | 20kN |
| SLMP-D40 | 2200 | 4000 | 22.2 | 20kN |
| SLMP-D50 | 2820 | 5000 | 35.2 | 20kN |
| SLMP-E30 | 1800 | 3000 | 20.0 | 30kN |
| SLMP-E35 | 2000 | 3500 | 24.3 | 30kN |
| SLMP-E40 | 2200 | 4000 | 26.8 | 30kN |
Important Instructions:
• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer's design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.








Hot Tags: adjustable 48/40mm scaffolding, China adjustable 48/40mm scaffolding manufacturers, suppliers, factory, adjustable props, shoring steel prop, i joists?, h20 beam, comaccord scaffolding adjustable steel prop, construction tripod?