Comaccord Building Material Co., Ltd
2.2-4m Light Heavy Duty Scaffolding
2.2-4m Light Heavy Duty Scaffolding
2.2-4m Light Heavy Duty Scaffolding
2.2-4m Light Heavy Duty Scaffolding
2.2-4m Light Heavy Duty Scaffolding
2.2-4m Light Heavy Duty Scaffolding
2.2-4m Light Heavy Duty Scaffolding

2.2-4m Light Heavy Duty Scaffolding

Steel Prop
1.Length: 2.2-4m 1.7-3.0m etc
2.Type: 60/48mm, 56/48mm, 48/40mm
3.Thickness: 1.6mm-3mm or as required
4.Surface:Power Coated or Pre-Galvanized

Send Inquiry
Description

Product Introduction


 

Steel prop is widely used in subway and foundation pit supporting to block the earth wall of culvert tunnel and prevent the foundation pit from collapsing.Steel prop is assembly used in subway construction such as fixed joint, flexible joint and so on.

Heavy props are the most popular of  telescopic props, designed and manufactured according to EN1065 standards. Size from 1500mm to 5000mm, working bearing load limit from 20kN to 30kN.

 

Advantages of adjustable shoring props

1. Simple structures, simple erection

2. High efficiency with strong loading capacity

3. With galvanized surface(endurable)

4. Widely application in proping system such as construction, plants

 

PRODUCT SPECIFICATIONS

 


item

value

Warranty

1 Year

After-sale Service

Online technical support, Free spare parts, Return and Replacement

Project Solution Capability

graphic design, Others

Application

industrial

Design Style

Modern

Place of Origin

China

 

Tianjin

Brand Name

longford

Model Number

Scaffold Props

Scaffolding Part Type

Scaffolding Props

 

 

product-673-603

 

product-753-559

product-1500-1500

 

product-492-575

FAQ


 

1. How to get a quotation?
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project
information for complete formwork & scaffolding proposal via below contacts.

2. What is the payment term?
By T/T or L/C.

3. What is the lead time?
Climbing template, self-climbing platform, plastic template, our warehouse stock. The preparations for loading will be
In 10 to 15 days.
For H20 wooden beams, TECON-Form blinds, the delivery time is 15 to 25 days.
For other systems, lead times range from 30 to 45 days.
For more accurate delivery time, please contact us for specific products according to your quantity.

4. What is the package method?
We have standard steel pallet, wooden pallet etc. which suits to container transportation.

 

Hot Tags: 2.2-4m light heavy duty scaffolding, China 2.2-4m light heavy duty scaffolding manufacturers, suppliers, factory, construction tripod, adjustable formwork construction scaffolding steel prop, scaffold props for sale, shoring steel prop, comaccord scaffolding adjustable steel prop, i joists?

Inquiry
goTop

(0/10)

clearall