Galvanized Metal Prop 4m Steel Prop
Steel Prop
1.Length: 2.2-4m 1.7-3.0m etc
2.Type: 60/48mm, 56/48mm, 48/40mm
3.Thickness: 1.6mm-3mm or as required
4.Surface:Power Coated or Pre-Galvanized
Product Description
The bearing capacity of the steel bracket is mainly determined by the wall thickness. We can provide steel column support with 3.5mm wall thickness. Its appearance is mainly determined by the way the surface is treated. Powder coating and pre-galvanizing give it a smooth and bright appearance. The more firmly the plastic coating or zinc coating on the steel bracket is attached, the better the rust prevention effect and the longer the service life.
We can OEM, ODM. We can manufacturing according to customer request.
|
Product name |
Steel prop |
|
Brand Name |
Sanye |
|
Material |
Q195 Q235 carbon steel |
|
Scaffolding Part Type |
Scaffolding Props |
|
After-sale Service |
Online technical support |
|
Color |
Customer Requirements |
|
Packing |
Bundle |
|
Advantage |
Stable, |
|
Project Solution Capability |
graphic design, 3D model design |
|
Design Style |
Industrial |
|
Surface treatment |
Galvanized/Painted |
|
Certificate |
ISO900/ISO14001/OHSAS 18001 |
|
Outer Tube |
48/56/60/76MM |
|
Plate |
square /flower plate/U head or others |
|
Inner Tube |
40/48MM |
|
Pipe Thickness |
1.4-4.0mm |
Packing & Delivery
To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.

Workshop


Production Process
The Process is: Buy back material(inspection)---Pipe cutting(inspection)---Selecting top & base plate(inspection)---Tube holes punching(inspection)---Welding---Welding inspection---Dip painting(inspection)---drying(inspection)---packaging(inspection)---To warehouse ready for delivery to customer.

Application

Exhibition

Certificate Report

FAQ
Q1. Are you a manufacturer or a trader?
We are a building materials manufacturer with a history of ten years, SS Group does both domestic market and export business.
Q2. What are your terms of payment?
Telegraphic transfer 30% prepayment, 70% before shipment under FOB terms.
Telegraphic transfer 30% prepayment, 70% payment against copy of bill of lading CIF.
Under CIF, 30% advance payment by telegraphic transfer and 70% L/C at sight.
Q3. Where is your factory?
A: Our factory is in Tianjin (near Beijing). We have sufficient production capacity and early delivery time.
Q4. May we visit your factory?
A: Of course. A warm welcome to your arrival. Please contact us before coming to China and we will arrange everything for you.
Q5. What is your delivery time?
Generally available is 5-10 days, no stock is 3-4 weeks, according to the quantity.
If you have another question, pls feel free to contact us as below:
Lily Lin
Comaccord Building Material Co., Ltd.
Mobile: +18850922460
Email: sales07@comaccord.com
Website: www.comaccord.com
Hot Tags: galvanized metal prop 4m steel prop, China galvanized metal prop 4m steel prop manufacturers, suppliers, factory, construction tripod, i joists beam, h20 beam?, adjustable props, manufacturer comaccord scaffolding adjustable steel prop, scaffold props for sale




