High Quality G Pin Scaffolding
Steel Prop
1.Length: 2.2-4m 1.7-3.0m etc
2.Type: 60/48mm, 56/48mm, 48/40mm
3.Thickness: 1.6mm-3mm or as required
4.Surface:Power Coated or Pre-Galvanized
Product Description
High Quality G Pin Scaffolding steel Prop for Construction
Discription:
1. Outer Dia:60mm/56mm/48mm, etc.
2. Inner Dia:48mm/40mm,etc.
3. Surface Treatment:Galvanized, painted color, powder coated.
4. Components: threaded tube, casting nut and pin,screw.
Specification:
|
Adjustable |
Outer pipe |
inner pipe |
Theoretical |
20 ft Container |
|
length(m) |
tube(mm) |
tube(mm) |
Weight(kgs) |
can load(pcs/bulk) |
|
0.8-1.4 |
48×1.6×765 |
40×1.8×835 |
4.74 |
3500 |
|
1.6-3.0 |
48×1.6×1600 |
40×1.8×1600 |
7.57 |
2200 |
|
2.0-3.5 |
48×1.6×1710 |
40×1.8×2000 |
8.45 |
2000 |
|
2.2-4.0 |
48×1.6×2000 |
40×1.8×2200 |
9.32 |
1750 |
|
|
|
|
|
|
|
1.6-2.9 |
56×1.6×1510 |
48×1.8×1600 |
8.95 |
2200 |
|
1.8-3.1 |
56×1.6×1510 |
48×1.8×1800 |
9.36 |
2100 |
|
2.0-3.6 |
56×1.6×1750 |
48×1.8×2000 |
10.29 |
2000 |
|
2.2-4.0 |
56×1.6×2010 |
48×1.8×2200 |
11.26 |
1750 |
|
|
|
|
|
|
|
1.4-2.7 |
60×2.0×1340 |
48×2.0×1400 |
9.45 |
2300 |
|
2.0-3.5 |
60×2.0×1540 |
48×2.0×2000 |
11.38 |
2000 |
|
2.2-4.0 |
60×2.0×1840 |
48×2.0×2200 |
12.7 |
1750 |
|
3.0-5.5 |
60×2.0×2540 |
48×2.0×3000 |
16.51 |
1500(40ft/in bulk) |


Product packaging
Packaged by bundle or bulk as clients requirement.

processing
1. The extruded products will be cut into the right sizes.
2. Some products will be punched to make fastening holes.
3. Some products require additional welding works.
4. Check the products quality
5. Finalized products will be coated with release with release agent.
6. Completed the pre-assembled before leaving the factory ,to make sure no mistakes .


Application
Our products are widely used in adjust the height of steel props.



Exhibition

Certificate Report

FAQ
Q: Are you a manufacturer?
A: Yes, we are. We are an OEM and ODM manufacturer of scaffolding. We make all kinds of scaffolding systems and accessories.
Q: What is your MOQ?
A: One full container.
Q: What is your payment terms?
A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.
Q: What's your delivery time?
A: 10-20 days after received the advance payment or L/C.
Q:Can I get samples before order?
A:Yes, of course. Usually our samples are free. we can produce it according to your samples or technical drawings. We can also build the molds and fixtures.
Q: Do you attend any exhibition?
A: Yes, we do. We have been attending exhibitions globally.
Q: Do u have other relative production?
A: We have steel pipe/ greenhouse frame/solar panel rack and other steel products.
Q:How can I get a quotation from you?
A:You can leave us message, and we will reply every message in time.
If you have another question, pls feel free to contact us as below:
Lily Lin
Comaccord Building Material Co., Ltd.
Mobile: +18850922460
Email: sales07@comaccord.com
Website: www.comaccord.com
Hot Tags: high quality g pin scaffolding, China high quality g pin scaffolding manufacturers, suppliers, factory, construction tripod?, h20 beam, comaccord scaffolding adjustable steel prop, adjustable formwork construction scaffolding steel prop, i joists?, i joists beam






