Comaccord Building Material Co., Ltd
Pump Jack Scaffolding
_MG_1043-1
_MG_1044-1
1.7-3M-8.60KG  (2)
0297e11d96d6b4e60f18769f2d55294
2569d1709c4bcfb698242bda12add4e
product (8)

Pump Jack Scaffolding

Steel Prop
1.Length: 2.2-4m 1.7-3.0m etc
2.Type: 60/48mm, 56/48mm, 48/40mm
3.Thickness: 1.6mm-3mm or as required
4.Surface:Power Coated or Pre-Galvanized

Send Inquiry
Description

Product Description


 

Pump Jack Scaffolding steel prop/shoring jack is a kind of supporting system which can be used for walls supporting, slab supporting, beam supporting and other shuttering supporting.

Light Duty Steel Shoring Prop

 

 

 

Adjustable Length

1.6-3.0m

1.8-3.5m

2.0-3.5m

3.5-4.0m

3.0-5.0m

Internal Tube

40*2-48*2mm

External Tube

48*2-56*2mm

Flower Plate

120*120*4mm

G Type

Lock Pin

Surface

Dip paint, Pre Galvanized, Hot dip galvanized

Heavy Duty Steel Shoring Prop

 

 

Adjustable Length

1.8-3.2m

2.1-3.4m

2.2-4.0m

3.5-4.0m

3.0-5.0m

Internal Tube

48*2-48*3.5mm

External Tube

60*2-60*3.5mm

Square Plate

120*120*4.5mm

G Type

Lock Pin

Surface

Dip paint, Pre Galvanized, Hot dip galvanized

product-640-640

 

 

Packing & Delivery



 

To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.

 

product-665-322

 

Workshop


 
product-712-281product-715-247
 

Production Process



product-741-419

 

Application


 

product-670-284

 

 

Exhibition


 

product-708-469

 

Certificate Report


 



product-709-374

 

FAQ 

 

1. How do I get a quote?
You can send us your bill of materials for a quote, or you can simply send us the structure drawings and plans
Information on complete formwork and scaffolding recommendations can be found through the contact details below.
Tel :+ 86-18850922460
Mobile phone :+ 86-18850922460

 

2. What are the terms of payment?
By wire transfer or letter of credit.

 

3. What is the delivery time?
Climbing template, self-climbing platform, plastic template, our warehouse stock. The preparations for loading will be
In 10 to 15 days.
For H20 wooden beams, TECON-Form blinds, the delivery time is 15 to 25 days.
For other systems, lead times range from 30 to 45 days.
For more accurate delivery time, please contact us for specific products according to your quantity.

 

4. What is packing?
We have standard steel pallets, wooden pallets, etc., suitable for container transportation.

 

5. Can you guarantee the quality?
We guarantee the quality of different products.

 

 

 

 

 

Hot Tags: pump jack scaffolding, China pump jack scaffolding manufacturers, suppliers, factory, steel adjustable props

Inquiry
goTop

(0/10)

clearall