Comaccord Building Material Co., Ltd
Building Material Scaffolding Formwork
Building Material Scaffolding Formwork
Building Material Scaffolding Formwork
Building Material Scaffolding Formwork
Building Material Scaffolding Formwork
Building Material Scaffolding Formwork
QQ20190916085557

Building Material Scaffolding Formwork

Steel Prop
1.Length: 2.2-4m 1.7-3.0m etc
2.Type: 60/48mm, 56/48mm, 48/40mm
3.Thickness: 1.6mm-3mm or as required
4.Surface:Power Coated or Pre-Galvanized

Send Inquiry
Description

Product Introduction:

Adjustable Scaffolding Prop Jacks are used as a temporary support for concrete formwork shuttering work, called acrow props, shoring jacks,scaffolding poles etc.

Acrow props are one of heavy duty scaffolding props in size 0 ,size 1, size 2, size 3, size 4 according to adjustable range and height.
Accroding to load capacity safety factor requirement, acrow props can be made in following specifications of inner tube and outer tube:

 

Inner Tube Outer Tube
OD48mm OD60mm
OD63mm OD76mm
OD60mm OD72mm
OD76mm OD89mm

 

Acrow prop nut can be in cast iron, cast steel or drop forged type.
There are zinc-plated, hot dip galvanized and painted props according to clients durable requirement.
Acrow prop sleeve can be welded to outer tube. There is also another way thread outer tube directly as prop adjusting sleeve.
Prop nut on prop sleeve with handle adjusting and fixing at a required height.

Shoring Jacks
Shoring Jacks are normally with cup type prop sleeve with handle.There also heavy duty , light duty and middle duty according to load capacity.
Shoring jack height customized and nromal height range would be 1.6m-3.0m, 1.9-3.5m, 2-3.6m, 2.2-3.9m, 2.5-4.0m, 4.8m, 5.0m, 5.5m, 6m etc.
Shoring Jack can be painted, powder coated,GI, E-galvanized and hot dip galvanized.

 

advantage
1. Durable, reusable and safe: steel props have large carrying capacity and can be reused many times
2. Can be extended to the desired length: Steel props can be adjusted to various height requirements.
3. Easy assembly and disassembly: Steel pillar structure is simple, fast, even unskilled workers are easy to install

 

 

Place of Origin Tianjin,China
Type middle east prop
Brand Name TYT
Model Number heavy duty prop
Material Q195 Q235 Q215 Q345
Surface treatment Galvanized/Power Coating
Application Building Construction
Color Customer Requirements
Certificate ISO9001:2008
Surface self coloured
Advantage Stable
Size OEM Size
Usage Concrete Construction Support

 

Product images

 

product-1500-1125product-810-1080

 

FAQ:

How to buy the ideal product?
You can give us your drawings, and we will produce according to your drawings.
If you do not have a clear plan, we can also design according to your requirements.
How to pay?
Both T/T and L/C are acceptable. T/T is preferred.
When is the delivery time?
It depends on the order quantity.
Generally speaking, the delivery time is within 15-30 days.
How about the quality of our products?
Our steel pillar piles are made of high quality materials
What is steel quality?
The system consists of Q235 steel conical tubes with welded blades,
And can be widely used in a variety of different geological locations.
How to order from Zhiyi?
Buyer inquiry → Get Zhiyi quote → Order confirmation
→ Buyer arranges 30% deposit → Start production after receipt of deposit

 

 

Hot Tags: building material scaffolding formwork, China building material scaffolding formwork manufacturers, suppliers, factory, i joists?, h20 beam?, scaffold props for sale, manufacturer comaccord scaffolding adjustable steel prop, adjustable formwork construction scaffolding steel prop, construction tripod?

Inquiry
goTop

(0/10)

clearall