Comaccord Building Material Co., Ltd
Construction Supporting Post Light Duty Scaffolding
2mm 4mm thickness galvanized  steel scaffolding
4.0m Scaffolding System Metal Steel
adjustable galvanized steel
Ajustable Light Duty Prop (2)
Building Material (2)

Construction Supporting Post Light Duty Scaffolding

Steel Prop
1.Length: 2.2-4m 1.7-3.0m etc
2.Type: 60/48mm, 56/48mm, 48/40mm
3.Thickness: 1.6mm-3mm or as required
4.Surface:Power Coated or Pre-Galvanized

Send Inquiry
Description

Product Description


 

(1) Steel column is mainly composed of bottom plate, outer tube, inner tube, rotating nut, cotter pin, upper plate and accessories
fold
Tripod, jack, simple and flexible structure.
(2) Steel column structure is simple, convenient disassembly.
(3) The steel column is adjustable, because the inner tube can be expanded and expanded in the outer tube, it can be adjusted according to needs
The height required.
(4) Steel columns can be reused. Even if it doesn't work, the material can be recycled.
(5) Steel columns can be adjusted according to the different heights of the building.

Paint VS Powder VS Galvanizing
1. Draw:
Paint dipping is a production process in which the raw steel pipe is repeatedly dipped into the paint pool. The function of dipping is to prevent corrosion and rust.

2. Whitewash:
Powder coating is a production process in which plastic powder is sprayed on the original steel pipe. Its coating is stronger than dip paint, and the appearance is brighter and smoother than dip paint.

3.Pre-Galvanized:
Pre-galvanizing is the process of dipping a steel strip into a zinc bath with a zinc content of 60-80g/m2. Zinc content can be customized.

4. Hot dip galvanizing:

Hot dip galvanizing is the process of dipping the steel pipe into a zinc bath, and the galvanizing amount is 300g/m2. Zinc content can be customized.

 

product-1-1

 

 

Packing & Delivery



 

1. Packed with bundles tightened with metal belt and plastic wrapped if need.

2. According to customer's requirement.

 

product-812-311
product-808-294

Workshop


 
product-712-281product-715-247
 

Application


 

Applications of Hot sale 3.6m adjustable scaffold support scaffolding props systems

 

product-365-351product-362-351

 

 

Exhibition


 

product-708-469

 

Certificate Report


 



product-709-374

 

FAQ 

 

1. Are you a factory or a trading company? Where is your factory?
We are a manufacturer with more than 25 years of history, to achieve the design, manufacturing, installation, service one-stop.
Commissioning and technical training of building materials industry.

 

2. Can you customize it?
Yes, we can. We accept ODM and OEM.

 

3. What is the Sample policy?
Samples available.

 

4. How long is the delivery time?
2-7 days after payment confirmation...

 

5. Have you arranged to ship the building materials?
Yes, we do. We will arrange the shipment for you either on FOB or CIF basis. EXW price, we will help you arrange the shipment.

 

6. How is the product packaged?
We export standard packaging or according to customer's requirements.

 

7. How to ensure the quality and operation before loading?
We have our own quality control department, from raw materials to finished products have advanced quality control system.
All building materials are 100% inspected and tested before leaving the factory.

 

If you have another question, pls feel free to contact us as below:

Lily Lin

Comaccord Building Material Co., Ltd.

Whats App: + 86 18850922460
Wechat: + 18850922460

Mobile: +18850922460

Email: sales07@comaccord.com

Website: www.comaccord.com

 

 

 

Hot Tags: construction supporting post light duty scaffolding, China construction supporting post light duty scaffolding manufacturers, suppliers, factory, h20 beam, construction tripod, i joists beam, i joists?, shoring steel prop, scaffold props for sale

Inquiry
goTop

(0/10)

clearall