Galvanized Steel Shoring For Construction Formwork
Product name:Scaffolding Surface treatment:POWER COATED, PAINING, PRE- GALVANIZED, ELECTRO GALVANIZED, HOT DIP GALVANIZED Types:SPAIN(48 /40MM), ITALY(56/48MM) AND MIDDLE EAST (GERMANY)60/48MM Nutt type:CUP, NORMALY, T TYPE, LTYPE
DESCRIPTION: Scaffolding Steel Prop
1. A complete set of steel pillar is composed of top plate, bottom plate, inner tube, outer tube, sleeve, nut, pin, etc.
2. Steel pillar structure is simple, easy to assemble and disassemble.
3. Adjustable to any length within its range; It can be reused.
4. Widely used in buildings, factories, Bridges and other support systems.
Feature
* Easy installation with tripod
* 20kN(Class D) and 30kN(Class E) different opening lengths are available for you to choose from
* Prevent misalignment of the inner tube from flying out of the outer tube
* The top of the inner tube is equipped with a 100mm safety area design to avoid injury to the user's hands
* Hot dip galvanizing treatment to prevent pillar corrosion, other treatments such as spray painting and electric galvanizing are also available
* Compliant with en1065
Details of Adjustable Scaffolding Steel Prop
| Item Name | Adjustable Shoring Prop |
| Material | Q355, Q235, or as your request |
| 1.6mm,1.7mm,1.8mm,2mm, 2.75mm, 3.0mm or as your request | |
| Hot Dip Galvanized, or Painted | |
| Type | Light duty, heavy duty |
| Adjustable Length | 1.4-4.0m |
| Outer Tube | 48mm,56mm, 60mm, 76mm or as your Request |
| Inner Tube | 40mm,48mm, 63mm or as your Request |
| Shape of plate | Flower, square, U-shape |
| Packing | Bundle with Steel Ribbon, Steel Pallet or as your request |
Packaging:
1. The total net weight of the general loading container is between 22 tons and 26 tons, which needs to be confirmed before loading.
2. Different products use different packaging:
-- Wiring harness: wood beam, steel pillar, tie rod, etc.
- Tray: Small parts will be placed in a bag and then placed on the tray.
-- Wooden box: available on request.
-- Bulk cargo: Some irregular goods will be packed into the container in bulk.
Delivery:
1. Production: If it is a full container, we usually need 20-30 days after receiving the customer's deposit.
2. Transportation: It depends on the destination toll port.
3. Special requirements are subject to negotiation.







Hot Tags: galvanized steel shoring for construction formwork, China galvanized steel shoring for construction formwork manufacturers, suppliers, factory, construction tripod, shoring steel prop, h20 beam, h20 beam?, scaffold props for sale, i joists?






