Scaffolding Props Shoring Jack From Factory
Steel Prop
1.Length: 2.2-4m 1.7-3.0m etc
2.Type: 60/48mm, 56/48mm, 48/40mm
3.Thickness: 1.6mm-3mm or as required
4.Surface:Power Coated or Pre-Galvanized
Product Description
1. A complete set of jack is composed of inner tube, outer tube, pillar nut, jack and bottom plate.
2. The internal support of the concrete slab adopts the column jack, which is more stable and reliable.
3. This jack is easy to assemble and disassemble; It can be adjusted to any length within its range.
4. The pillar jack parts are connected by CO2 arc welding to ensure good crack resistance and deformation resistance.
5. This kind of pillar jack is widely used in Africa, South America and the Middle East market
|
Description |
Adjustable Length (mm) |
Inner Tube(mm) |
Outer Tube(mm) |
|
Heavy Duty Middle East Or German Prop |
1400-2700 |
48*2 |
60*2 |
|
2000-3600 |
48*2 |
60*2 |
|
|
2200-4000 |
48*2 |
60*2 |
|
|
3000-5000 |
48*2 |
60*2 |
|
|
Light Duty Spanish Prop |
800-1400 |
40*1.8 |
48*1.8 |
|
2000-3600 |
40*1.8 |
48*1.8 |
|
|
2200-4000 |
40*1.8 |
48*1.8 |
|
|
3000-5000 |
40*1.8 |
48*1.8 |
|
|
Light Duty Italian Prop |
1600-2200 |
48*2 |
56*2 |
|
1800-3100 |
48*2 |
56*2 |
|
|
2000-3600 |
48*2 |
56*2 |
|
|
2200-4000 |
48*2 |
56*2 |



Packing & Delivery
To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.

Workshop


Production Process

Application

Exhibition

Certificate Report

FAQ
1. How big is the workshop?
Covers an area of 100,000 square meters, building area of 15,000 square meters.
2. What is the annual production capacity of fast scaffolding?
About 25,000 tons/year
3. When is the delivery time?
Generally, the delivery time is 30-45 days after receiving the advance payment.
4. Can Rapid scaffold provide samples?
Yes. If the sample is ordinary, it is free. If the sample is customized, there are different models, you will be charged.
5. What is the quality management system?
Fast scaffolding has passed ISO international quality certification.
6. Fast scaffold design and development of new products?
Rapid Scaffolding prides itself on providing a team of experienced, qualified engineering and technical experts. We can design and produce new products according to your requirements.
7. How to store scaffolding?
For EP, PC, spray paint scaffolding, it is recommended to store in a ventilated and dry room. The finished product is HDG scaffolding, no special requirements.
8. What is the life span of your product?
The service life of hot-dip galvanized products is about 10 to 15 years, depending on the specific situation.
If you have another question, pls feel free to contact us as below:
Lily Lin
Comaccord Building Material Co., Ltd.
Mobile: +18850922460
Email: sales07@comaccord.com
Website: www.comaccord.com
Hot Tags: scaffolding props shoring jack from factory, China scaffolding props shoring jack from factory manufacturers, suppliers, factory, i joists beam, shoring steel prop, h20 beam, adjustable formwork construction scaffolding steel prop, manufacturer comaccord scaffolding adjustable steel prop, i joists?






